The hardening time for an infrared asphalt patch largely depends on two factors: weather conditions during application and the thickness of the patch.
- Weather Conditions: The hardening process of asphalt, also known as curing, is influenced by weather conditions. In warm and dry conditions, asphalt patches can harden faster, typically within a few hours. However, in cold or humid conditions, the process can take longer – sometimes up to a day or more.
- Patch Thickness: The thickness of the asphalt patch also affects its curing time. Thicker patches take longer to harden than thinner ones. Therefore, if you’re planning on applying a heavy load on the repaired surface soon after the repair, it’s advisable to use a thinner patch and allow it more time to harden.
Post Views: 43